PWG Meeting - 04 - 03 -2025

  • Update on IESA meetings with Niti Aayog and Ministry of Heavy Industries.
  • IESA Inputs to MOF, MNRE on Investments made in BESS until December 2024.
  • Amendments to the Guidelines for TBCB process for procurement of Firm and Dispatchable Power from grid connected RE power project with ESS.
  • Guidelines for procurement of storage capacity stored energy from PSPs.
  • Advisory on co-locating ESS with Solar Power Projects to enhance grid stability and cost efficiency.
  • Procedure for verification of Captive status of such generating plant, where captive generating plant and its captive users are located in more than one state.
  • IESA Recommendations to MEDA on Maharashtra Renewable Energy Policy.
  • Madhya Pradesh Renewable Energy Policy, 2025.
  • Madhya Pradesh Scheme for Implementation of Pumped Hydro Storage Project 2025.
  • IESA inputs on Industry Consultation: Electric Vehicles (EV) scale up Consultation (EV4 - EVSE Charging Equipment and ACC Battery Storage) chaired by CEO, NITI Aayog.
  • Madhya Pradesh EV Policy, 2025.
  • The Battery Waste Management Amendment Rules, 2025.
  • IESA-IGHC's recommendations on the Green Hydrogen Certification Scheme for India (GHCI).
Published: 7th Mar 2025
arrow_upward