Least cost pathway for power sector investments in Gujarat through 2030
Gujarat is one of the largest state in terms of electricity demand, with a peak load of 19.4 GW and annual electricity consumption of 116.4 TWh in 2021 which is expected to increase by 83% by 2030. RE installed capacity in Gujarat is 7.87 GW solar and 9.44 GW wind as on March 2022. RE contributing to around 28% in total electricity generation by fiscal year 2021-22.
The objective of this study is to find the least-cost and operationally feasible resource mix for Gujarat to meet its load reliably through 2030. The study uses the latest RE and battery cost data, an industry-standard power system modelling platform (PLEXOS), and exhaustive analytical methods.
The objective of this study is to find the least-cost and operationally feasible resource mix for Gujarat to meet its load reliably through 2030. The study uses the latest RE and battery cost data, an industry-standard power system modelling platform (PLEXOS), and exhaustive analytical methods.
Published:
13th Feb 2023
Custom detail page Blocker Module
Become an IESA Member Today!
IESA Membership provides your organization with a host of benefits:
- Policy & Regulatory Advocacy
- Knowledge Platform
- Market Research & Strategy Support
- Tender Alerts & Analysis
- Business Support
- Opportunity to Interact with Decisionmakers
- Outreach Platform for your Product, Solution & Services
- 25+ Networking Events
- Leverage International Partnerships for a Global Presence
Our membership plans
Corporate Memberships
Starting from ₹150,000 /-
₹150,000
Gain access to industry reports, working groups, networking events and more
Individual Memberships
Starting from ₹5,000 /-
₹5,000
Gain access to Policy and Regulatory Advocacy, Career Growth, Networking Events and more