IESa analysis on RfS Document for Selection of RE Power Developers for Supply of 1200 MW of Round-the-Clock (RTC) Power from ISTS-connected Renewable Energy (RE) Power Projects in India, under Tariff-based Competitive Bidding (SECI-RTC-IV)
Opportunities
Selection of RE Power Developers for Supply of 1200 MW of Round-the-Clock (RTC) Power from ISTS-connected Renewable Energy (RE) Power Projects in India, under Tariff-based Competitive Bidding (SECI-RTC-IV). The Projects will be set up under “BOO” model.