RFS for purchase of power through competitive bidding process (followed by reverese e-auction) from 500 MW RE projects with assured Peak power supply with Energy Storage System (ESS) to be set up in Guajart (Phase XV).
RFS for purchase of power through competitive bidding process (followed by reverese e-auction) from 500 MW RE projects with assured Peak power supply with Energy Storage System (ESS) to be set up in Guajart (Phase XV).