UPEIDA invites Expression of Interest (EOI) for Setting Up of Charging Stations for Electric Vehicles in Cities and Highways/ Expressways in the State of Uttar Pradesh
Opportunities
Implementing Agency shall be responsible for Installation, Operation and Maintenance of Public Charging Stations (PCS)/Fast Charging Stations (FCS)/ Battery Charging Stations(BCS)/Battery Swapping Facility(BSF) for designated period as per parameters laid down in the GOI guidelines dated 14.12.2018 (attached herewith).
In case of Public Charging Stations, the minimum requirements shall be as laid down in the Clause 3 & 5 of GOI guidelines dated 14.12.2018.
In case of Public Charging Infrastructure (PCI) for long distance EVs and/ or heavy duty EVs the minimum requirements shall be as laid down in the Clause 4 of GOI guidelines dated 14.12.2018.
Following Cities/ Expressways have been identified in First Phase for Development of Charging Infrastructure of Electric Vehicles in the State of Uttar Pradesh :-
Lucknow.
Kanpur.
Varanasi.
Agra.
NOIDA.
Prayagraj.
Ghaziabad.
Meerut.
Agra Lucknow Expressway.
Delhi Agra Expressway (for U.P. portion) .
Eastern Peripheral Expressway (for U.P. portion).
Purvanchal Expressway (under implementation).
National Highway No AH-1 (U.P. Portion)
National Highway No. 24 (Lucknow-Bareilly-New Delhi up to UP Border).
National Highway No 27 (Lucknow-Gorakhpur-Kushinagar).
RfS for Setting up of 500 MW/1000 MWh Standalone BESS under Tariff Based Global Competitive Bidding in the premises of Power Projects Owned by RVUNL and GSS of RVPNL along with additional Green Shoe option of 500 MW/1000 MWh with Viability Gap Funding (VGF) Support” under “BOO” model.
RfS for Setting up of 500 MW/1000 MWh Standalone BESS under Tariff Based Global Competitive Bidding in the premises of Power Projects Owned by RVUNL and GSS of RVPNL along with additional Green Shoe option of 500 MW/1000 MWh with Viability Gap Funding (VGF) Support” under “BOO” model.
RfS for Setting up of 500 MW/1000 MWh Standalone BESS under Tariff Based Global Competitive Bidding in the premises of Power Projects Owned by RVUNL and GSS of RVPNL along with additional Green Shoe option of 500 MW/1000 MWh with Viability Gap Funding (VGF) Support” under “BOO” model.
Selection of RE Power Developers for Supply of 1200 MW of Round-the-Clock (RTC) Power from ISTS-connected Renewable Energy (RE) Power Projects in India, under Tariff-based Competitive Bidding (SECI-RTC-IV). The Projects will be set up under “BOO” model.
SECI - Request for Selection (RfS) Document for Selection of Solar Power Developers for Setting up of 2000 MW ISTS-Connected Solar PV Power Projects with 1000 MW/4000 MWh Energy Storage Systems (ESS) in India under Tariff-Based Competitive Bidding (SECI-ISTS-XVII)