Tender For Supply, Installing, Testing And Commissioning Of 101 Kwp Capacity Grid Solar Power Pack And Charging Station (Energy Saving System).
Published :
2nd Aug 2022
Selection of Partner For Operation And Maintenance Of Ev Chargers On Expressways / Highways.
Published :
16th Jul 2022
Supply, Installation, Testing And Commissioning Including 5 Years Of Post-Warranty Maintenance Of 12 Twelve Fast Electric Vehicle Chargers Including Appropriate Online Application For Payment And Remote Monitoring.
Published :
14th Jul 2022
EPC package for development of 10MW/40MWh battery energy storage system (BESS) at NTPC Ramagundam
Published :
7th Jul 2022
Request for Selection (RfS) Document for setting up of Pilot Projects of 500 MW/1000MWh Standalone Battery Energy Storage Systems in India under Tariff-Based Global Competitive Bidding (ESS-I).
Published :
24th Jun 2022
Invitation For Expression Of Interest For Empanelment Of Financial Institutions For Electric Vehicles Across India.
Published :
23rd Jun 2022
Provision Of Electric Vehicle Charging Point At Command Mess And Rerouting Of Ug Power Supply Cable For N1-N3 Jetty Substation Under Age E/M No-I And Shifting Of 160 Kva Transformer And Street Light Poles With In Mo(V) Yard Under Age E/M No-Ii Of Ge.
Published :
20th Jun 2022
Selection Of Operator For Procurement, Operations And Maintenance Of 80 No. ( 30 No. Of Brts 12 M , 50 No. Of Intracity Buses 9 M ) Fully Electric Ac Buses.
Published :
16th Jun 2022
Kerala State Electricity Board Limited (KSEBL), the State owned Power Utility has invited an Expression of Interest for the setting up of 10 MW Grid Scale Battery Energy Storage system at specified locations approved by KSEBL within the State of Kerala.
Published :
15th Jun 2022
Solar Energy Corporation of India Limited (SECI) hereby invites proposals for setting up of ISTS-connected Pilot Projects of Standalone Battery Energy Storage Systems (BESS), for an aggregate storage capacity of 1000 MWh (500 MW x 2 hrs).
Last date of bid submission: 10th June 2022.
Published :
10th Jun 2022
PGCIL Pre-Bid Tie-up for Battery Energy Storage System Package BESS-01 for Setting up of Pilot Projects of 500 MW/1000MWh Standalone Battery Energy Storage Systems in India under Tariff Based Competitive Bidding (TBCB) Route prior to RfP bid submission by POWERGRID to BPC.
Published :
10th Jun 2022
Development of ISTS Connected 250 MW/500 MWh Standalone BESS
Published :
10th Jun 2022
Setting up grid-scale battery energy storage system (BESS) with capacity up to 10 MWh
Published :
9th Jun 2022
NTPC Renewable Energy, a wholly-owned subsidiary of NTPC Limited, has invited bids from developers to set up interstate transmission system (ISTS)-connected energy storage systems of 3,000 MWh capacity with 500 MW (minimum) capacity anywhere in India.
Published :
6th Jun 2022
NTPC Ltd. invites online bids from eligible bidders on Single Stage Two Envelope (i.e., Envelope-I: Techno-Commercial Bid and Envelope-II: Price Bid) with Reverse Auction for development of 10mw/40mwh battery energy storage system (BESS) AT NTPC Ramagundam.
Published :
23rd May 2022